Water & infrastructure
Zafaraniya sewage pumping station
Civil construction and pumping-station equipment at PS-SE-3, part of the Zafaraniya trunk-sewage project in Baghdad.
Zafaraniya / Baghdad, Iraq
Scope of work
Kado’s role was construction of Sewer Pump Station PS-SE-3 for the Zafaraniya trunk-sewage project in Baghdad. The project table names Parsons Infrastructure as the client and identifies the station within the wider sewage scheme.
Work on site
The construction photographs show excavation, reinforcement and formwork alongside installed valve assemblies and pipework. These are the civil and mechanical components visible in the station’s construction record.
Project photographs
The main photograph shows the station’s installed pipework and valves. The detail images show equipment connections and reinforcement during construction, giving a closer view of the work beneath and around the installed equipment.


Project sources & photograph references
- Kado Company profile-2023-Updated-part 1.pdf · pp. 6 · Named station, location, client and construction scope.
- Kado Company profile-2023-Updated-part 2.pdf · pp. 40, 41, 42, 43 · Station construction and equipment photographs.
- KADO GROUP COMPANY PROFILE (1).pdf · pp. 22 · Historic appreciation material relating to Zafaraniya Pump Station 3.
- Kado Company profile-2023-Updated-part 2.pdf · pp. 40 · Installed valve and pipework assemblies at the Zafaraniya pumping station.
- Kado Company profile-2023-Updated-part 2.pdf · pp. 40 · Pump-station equipment and pipework detail in the Zafaraniya section.
- Kado Company profile-2023-Updated-part 2.pdf · pp. 41 · Reinforcement and formwork during pumping-station construction.
Discuss a related project
Start with your location and scope.